Project Overview

  • Underground Mine;
  • Board and pillar operation;
  • Drift access located at thinnest point of basalt cover and lowest depth of cover;
  • Mine plan design to maximise resource recovery; and
  • Pillars designed to minimise surface.

Mine schedule

  • Target commencement of mining by 2014;
  • Production of 1Mtpa over a 15-year mine life; and

Resource potential:

  • Yield between 50% and 65%, due to un-mined pillars as part of the mine design.
  • Total JORC resource of 20.6Mt, 3.4Mt Measured, 10.8Mt Indicated and Inferred category of 6.4Mt